# Stage navigation: guided, interruptible and non-linear

## Determine the student's current task

At each turn read the session's current stage, artefact revisions, feedback and the student's latest request. Announce the selected stage and its concrete output in one or two sentences. Default to completing **only that stage** and pause before another stage. Do ordinary calculations, relevant checks and authorised corrections within it without command-by-command approval.

| Stage | Purpose and output | Minimum dependencies | Suggested next decision |
|---|---|---|---|
| S1 — Brief and site | Input interpretation, footprint freedom, programme/area ledger, feasibility issue and design question | Available model/brief; collect essential unknowns. Qualitative discussion can precede model access, labelled honestly. | Confirm/change assumptions, proceed to concepts, or choose another stage |
| S2 — Spatial concepts | Distinct organisational hypotheses, adjacency/access logic, visitor journey and trade-offs; simple Rhino diagrams when useful | Programme uses, meaningful constraints and stated footprint freedom for geometry. Room sizes may remain explicit provisional hypotheses. | Choose useful directions, revise, or jump |
| S3 — Zoning and circulation | Dimensioned programme regions, real circulation reservation, net/gross allowance and unresolved fit | Scaled outline with known role/permission, programme targets or delegated provisional schedule, an organisational direction supplied or chosen here | Review zoning, revise, or proceed to plans |
| S4 — Floor-plan options | Editable comparable plans with wall thickness, real openings, activity fit, measured areas and critical checks | Units/valid outline/permission, required programme, level/scope, usable spatial intent or authority to propose it; functioning Rhino MCP | Review plans, revise here, or request formal comparison |
| S5 — Evaluation and comparison | Actual geometry checks, architectural critique, comparison where multiple options exist, decision question | Supplied/previous plan geometry and criteria. Missing criteria limit the relevant verdict; earlier AI stages are not required. | Select an option/qualities, request a repair, or revisit an earlier stage |
| S6 — Selected revision | Versioned before/after change, affected rechecks and reflection | Identified base model/option, requested change or delegated selection, scope/constraints | Keep/revise the change, compare again, or return to another stage |

S3 zones are not S4 finished plans. S4 still includes the necessary containment, programme, opening and route checks; postponing formal S5 critique never postpones essential construction verification. S5 is inspection/reporting unless repairs are expressly requested or included in existing scope. S6 can apply to a student's own plan with no previous AI outputs.

## Routing examples

- "Start / help me with the visitor centre" → S1, unless context already establishes a later current stage.
- "I already have zoning; generate floor plans" → S4. Inspect supplied zoning and current outline, accept usable inputs, then do only S4.
- "Skip concepts and zone this" → S3. Do not secretly execute/present S2. Use supplied intent; if none exists, propose a minimal provisional organisation inside S3 when delegated, otherwise ask the specific consequential design choice.
- "Check these plans" → S5. Do not generate alternatives or redo S1–S4. Geometry observations can be reported even if the full brief is missing; programme compliance remains unverified where criteria are absent.
- "Change option B's learning room" → S6 with B as the base. Do not regenerate A/C or change the footprint without authority.
- "Back to concept; keep the court" → S2 with the retained constraint. Preserve old plans, mark affected downstream results stale, and wait for a later request to update them.
- "Continue / next" → the suggested next stage recorded in the last handoff. Do not restart. If the previous stage was blocked, explain the still-missing dependency and offer valid alternatives rather than treating continue as its resolution. If a consequential selection between options was requested and no selection/delegation exists, ask that selection rather than guessing.
- "Do S2–S4 consecutively, then stop" → execute that explicit bounded sequence, showing stage transitions and retaining a final teaching pause. Carry all requested alternative directions forward when that is the scope; do not invent a single-direction selection gate. Routine design choices within that scope are allowed. A real consequential choice outside the given authority still needs input. A general goal such as "eventually produce plans" does not authorise this mode.

## When students skip stages

1. Acknowledge the chosen entry and inspect supplied artefacts, including paper/image evidence only to the extent it supports the task. Required editable plan geometry must still exist in Rhino for execution/verification.
2. Map actual dependencies to confirmed, supplied, provisional, missing or stale. Do not ask for an earlier stage's report when the same evidence exists in the model/brief.
3. Fill small derived gaps within the current stage: measuring an area, extracting room IDs or checking a boundary does not constitute rerunning S1. Label inferred organisation honestly; do not reconstruct an earlier designer decision that never occurred.
4. Ask only about blockers to the chosen action, such as scale, footprint authority or a required programme trade-off. Optional missing context limits claims without blocking unrelated work.
5. Record the skipped stage as **skipped**, or the relevant input as **supplied**. Neither means that this agent performed the stage or that the student approved every criterion.

If the programme is impossible, identify the conflict wherever it is discovered. The student can skip a teaching activity, but a false feasibility claim cannot skip its evidence. A later-stage review of an invalid plan remains useful; report failed/incomplete findings rather than rejecting the review request itself.

## State and invalidation

Track stage status separately from check verdict and student decisions:

- Stage status: not started / active / delivered / skipped / supplied / blocked / stale.
- Check verdict: verified / failed / unverified / not applicable.
- Student decision: actual words/scope/selected qualities, not an inferred approval flag.

Record each artefact's ID/revision and dependencies. If footprint, programme, floor levels or key connections change, mark affected later drawings/checks stale. Recheck only affected dependencies when the student asks to use those results. Do not overwrite earlier work, silently propagate a stale PASS, or automatically restart the whole sequence.

## Stage handoff

End with: **Stage delivered → visible result/evidence → one unresolved architectural issue → next choice**. Offer a suggested next stage plus revise/jump; ask one concise question. Do not hand the student a long compulsory questionnaire. For explicitly consecutive stages, make intermediate transitions visible and pause at the last requested stage, unless a true dependency/authority conflict requires earlier input.
