# Provenance and limits

Version 2.0.0, prepared 2026-09-22 for Henrik's Liverpool MArch workshop brief: small buildings, mainly visitor centres, supplied outline and programme, variable/free form, Rhino + MCP only.

Version 2.1.0, revised 2026-09-23: explicit one-stage-at-a-time facilitation, six named entry points, student-supplied/skipped stages, dependency-aware jumps, backtracking and stale-result tracking. This supersedes 2.0.0's broader batch-oriented workshop sequence; the geometry and evidence requirements remain in force.

This is a clean successor to the 2026-09-21 `emergentai-protocol` workshop package (itself derived from W04/T6). Retained principles: programme-led spatial reasoning, concept continuity, editable geometry, visible critique, preservation of iterations and verification of actual results. Replaced: hotel-lobby coordinates and quotas, universal entrance buffers, fixed ceiling/lift schema, graphic-style quotas, forced enclosure/decoration, one-option-first comparison bias and simulated designer replies. The legacy skill is not a runtime dependency.

Architectural procedures here are design heuristics. Their usefulness must be tested against real student models; document or scenario checks cannot establish architectural success. Development evidence is recorded separately in the workshop's `app_doc`.

## Primary source entry points

- [RhinoCommon API](https://developer.rhino3d.com/api/rhinocommon/): verify supported geometry types/methods for the installed Rhino runtime before writing adapter-specific execution code.
- [Rhino model units and tolerances](https://docs.mcneel.com/rhino/8/help/en-us/documentproperties/units.htm): confirm document-specific settings and the source model's intended scale.
- [Approved Documents collection](https://www.gov.uk/government/collections/approved-documents): source entry point for projects actually governed by the relevant English requirements, not for every Liverpool student project.
- [Approved Document M](https://www.gov.uk/government/publications/access-to-and-use-of-buildings-approved-document-m): inspect the applicable volume/version when assessing access to a non-domestic building in scope.
- [Approved Document B](https://www.gov.uk/government/publications/fire-safety-approved-document-b): inspect applicable current editions and transitional arrangements before a fire-related numerical claim.

These links are not an encoded compliance ruleset. Recheck current source/applicability during a real project. No room size, WC count, corridor dimension, occupancy or travel distance is certified by this package.
