# Evidence-based evaluation

Run geometry tests on the final option state and identify its saved checkpoint when available. If persistence is not yet verified, identify the exact live document/revision and keep delivery incomplete; the live check results must not be attributed to an unverified saved file. Record requirement/source, geometric objects, method/tolerance, measured result, status and limitation. Recheck affected dependencies after repair, including shared layers/materials and neighbouring rooms. A display colour or text label is not evidence.

Maintain one session [constraint and check registry](../assets/check-registry-template.md). Building and checking must use the same active criterion IDs and values. Separate non-negotiable brief requirements, provisional design targets and source-verified regulatory criteria. An experiential arrival preference is not a physical egress clearance rule. No exemption may let walls or furniture block a required route. Record superseded criteria and authority rather than leaving conflicting values in multiple scripts. If a check has no implementation or evidence, its status is unverified, even when a report heading calls it a full audit.

## Feasibility checks

| Check | Evidence required | Treatment of failure/unknown |
|---|---|---|
| Source integrity | Geometry/attribute comparison of protected inputs before/after | Stop and recover if changed without authority. |
| Region validity | Closed planar curves/regions, self-intersection and level checks | Resolve invalid regions before area/containment claims. |
| Perimeter/envelope | Region difference against exact authorised boundary, including holes; maximum outline changes if adjustable | Out-of-bounds area is failed unless explicitly permitted. |
| Area reconciliation | Actual region areas; union/overlap and residual accounting; wall/structure/circulation allocation | Missing net uses, overlap/double counting or unexplained deficits block a feasible label. |
| Programme fit | Each required ID/quantity/area range; representative activity/equipment geometry | Missing/undersized required uses fail; no silent deletion or renaming. |
| Doors and reachability | Actual boundary/opening checks plus access-role graph | An isolated required room or inappropriate route fails. |
| Usable movement | Real opening widths and continuous clear route geometry, turns and relevant operating modes | A graph-only result is unverified for physical clearance. |
| Furniture/activity fit | Actual footprint/use-envelope intersection against walls/obstructions | Geometry overlap cannot be excused by a convincing image. |
| Vertical coherence | Real level connections, section/landings/headroom evidence where relevant | Unsupported vertical links remain unverified; no complete-plan claim. |
| Form/section/structure | Stated structural/roof concept and diagnostic dimensions/section | Record schematic plausibility or unresolved issue; not engineering certification. |
| Model persistence | Saved editable checkpoint plus supported readback in isolated state | Failed save means incomplete delivery. |

Tolerance is a model-specific numerical setting, not a design waiver. Record length/area tolerances in the model's units and justify against scale. Do not hide centimetres of design collision behind an excessively large tolerance. Exact Boolean failure is unverified, never automatically pass. If tessellated geometry is used, record approximation error and avoid claiming more precision than the representation supports.

Critical checks depend on the claim: source protection, permitted footprint, required programme and actual access are critical to a feasible plan. A missing solar study is not a reason to call a measured schematic layout failed, but it prevents an environmental-performance claim. An inaccessible required room cannot be rescued by a high design score.

All applicable critical checks must be verified before a geometrically feasible label. A critical failed check rejects that candidate in its current state; a critical unverified check makes it incomplete. A live model can be geometrically checked while save/readback remains unverified: report those as separate fields and do not call editable delivery complete until persistence evidence is sufficient.

## Architectural critique

After the critical checks, discuss spatial sequence and legibility; room proportions and activity; privacy/acoustics where relevant; relation to site and exterior; form/plan/section coherence; plausible construction/servicing; adaptability; and economical use of area. Use the project's priorities, not equal-weight universal scoring. Explain tensions: a court may improve orientation but consume area; a loop may enrich visits but complicate after-hours operation.

Use **supported / mixed / weak / not assessed** for qualitative judgments, with a reason. State what would change the judgment. Do not fabricate daylight, fire, acoustic or structural simulation results. Do not claim a pretty plan is spatially meaningful without walking through its use.

## Comparison and rejection

Show requested area versus measured area per programme ID, total gross/net/circulation, outline change and critical-check status for every option. List which options are currently feasible, incomplete or rejected. Keep rejected options in the record with reasons, not in the recommended set. If all fail, say so and identify the actual brief/geometry conflict; do not pick the least invalid option as a successful result.

Rank only against explicit student priorities. Prefer a trade-off table to a single opaque number. Keep the strongest objection to the recommended option. A recommendation is provisional until student selection, and verified geometry is not designer approval.

## Access, safety and jurisdiction

Discuss clear movement, legible exit strategy and inclusive use as early design questions. Obtain location, building use, occupancy and applicable current sources before assigning numeric regulatory tests. Store document title/version/date, relevant provision and applicability with every code-derived criterion. Campus location does not establish project jurisdiction. If required source verification is unavailable, mark regulatory checks pending; do not reuse the hotel's numeric assumptions. Schematic evidence does not establish statutory approval.
