# Spatial hypotheses, not decorative variants

## Derive options from the brief

Read site evidence and the programme ledger. Draw the functional adjacency and access graph in Rhino if it clarifies the design. Distinguish relations that cannot change from preferences to explore. Link every proposed organisational move to a concrete need or spatial opportunity.

Potential organisations include a spine, central hall, sequence of rooms, loop, court, clustered pavilions or hybrid. They are a vocabulary, not a mandatory three-option menu. Do not force a courtyard where its area penalty breaks the brief, nor make a curving building internally rectangular by default. Rectangular service rooms within a curved envelope can be useful when the residual space and construction logic are resolved.

For each candidate, record:

1. A one-sentence hypothesis: how organisation helps particular users or activities.
2. A room/access graph and entry-to-destination journey, including return/exit and visitor choice.
3. Grouping of public, controlled and service uses; public access to amenities when other uses close.
4. Relationship of rooms to exterior, topography, proposed openings and landscape where known.
5. A preliminary area ledger and the hardest activity/clearance fit.
6. How form, roof, structure and section enable or complicate the plan.
7. What could make this option fail and what evidence would reveal that failure.

Compare candidates while the geometry is still inexpensive to change. Preserve useful unexpected discoveries from modelling; revise the hypothesis when the model contradicts it, documenting the change.

## Freedom of form

**Fixed:** develop varied topology, thresholds and internal spatial character inside the same real polygon. Do not edit the input curve or manufacture diversity by moving protected entrances.

**Adjustable:** show original versus proposed outline on separate layers. For each move record the affected edge, displacement or transformation, area change and programme benefit. Check all authorised limits, including protected trees, setbacks supplied by the student and total area/height limits.

**Envelope:** distinguish available site from enclosed building and external circulation. Different compactness, courts, clusters and orientation can be explored if the brief allows them. Check actual external connections between pavilions, weather exposure and access/servicing; do not count walking through a garden as enclosed circulation.

A new outline must earn its complexity: useful room depth, legible movement, workable thresholds and coherent structure/roof. Do not smooth or rectangularise a student's meaningful geometry merely for tool convenience. Where a spline is approximated for calculation, preserve the exact source and record the maximum deviation/tolerance.

## Diversity test

Describe differences in a compact matrix: room/access topology, visitor sequence, public-service relationship, exterior relationship, footprint/section and principal trade-off. At least one substantive spatial difference must be evidenced between each pair; ideally more than one when freedom permits. An unchanged service core can support different public organisations. For a very tight brief, report that only two credible organisations were found instead of faking a third.

Give equal schematic effort before ranking. Do not fully furnish option A and compare it against bubbles for B/C. Where construction budget is limited, reduce drawing detail consistently across options, not their architectural reasoning or required programme.

## Reasoning visible to students

Before editing: state observed constraint/opportunity, interpretation, proposed move and expected consequence. After editing: state what actually happened, measured evidence and the new design question. This is a concise architectural rationale, not private reasoning or a claim about the AI's internal process.

Use precedents only if they answer an actual design question. Verify any named project and attribute its source when searching. A visitor-centre plan does not require imitation of named architects' graphic styles or a quota of case studies. Avoid speculative environmental/structural conclusions; an indicated roof span is a hypothesis until evaluated.