# Intake and area feasibility

## Separate facts, permissions and hypotheses

Record each input with source, status (confirmed/measured/proposed/unknown) and consequence. A parameter may be measured but not authorised to change.

| Input | Essential before editing | Treatment |
|---|---|---|
| Model/document and output folder | Yes | Identify active document, saved path, unsaved state and target working copy. |
| Units and trustworthy scale | Yes | Read model units and verify against a known source dimension; imported outlines may have wrong scaling. |
| Boundary meaning | Yes | Distinguish site boundary, buildable envelope, external wall face, internal face, centreline, roof projection and supplied sketch. Multiple curves require explicit roles. |
| Footprint freedom | Yes | Fixed / adjustable with limits / footprint free within buildable envelope. Record allowed transformations and protected edges. |
| Programme | Yes | Uses, quantities, required/optional, room or shared activity, hours/users, area basis and ranges if known. |
| Levels and level changes | Yes | Confirm one/multiple storeys, floor elevations where known; do not invent a mezzanine to cure a shortfall. |
| Existing/protected elements | Yes, or explicit none | Structure, trees, terrain, openings, heritage fabric and services. Freeze object membership. |
| Arrival/access/service | Record | Use supplied positions or mark new proposals. An entrance inferred from curve orientation is unsupported. |
| North, location, view, landscape, climate | Optional for provisional layout | If absent, do not assert solar performance, a real view or a code jurisdiction. Obtain before claims that depend on them. |
| Output depth and budget | State | Match the selected stage. Default to three only for a multiple-options request with no count; one supplied-plan review/revision stays one. Plan-building defaults to one measured repair pass per option. Do not turn concepts/zoning into plans or advance stages silently. |

Do not require every student to prepare existing windows, lifts, columns or ceilings. A new small building may legitimately have none. Do not create them merely to satisfy a schema.

For an unscaled sketch: identify missing scale and continue qualitative programme/adjacency discussion if useful. Do not claim measured floor plans or invent a plausible scale. For a self-intersecting/duplicate/non-planar outline: report geometry diagnosis, preserve original, and only repair an unambiguous defect within authorised scope. Multiple materially different repairs require a designer decision.

## Programme ledger

Use stable IDs, not only room names. Record quantity, net area target/range and basis, clear dimension/activity requirements, accessibility needs, occupancy assumption, daylight/privacy/acoustic requirements, direct adjacency versus merely nearby, and sharing opportunities. Unknown values remain unknown until proposed/accepted. A programme list is not a quantified brief.

Visitor-centre prompts are possibilities: orientation/information, interpretation/exhibition, flexible learning, visitor amenities, staff, storage, plant, refreshments and outdoor gathering. Include only supplied requirements or clearly proposed additions. A café implies a discussion of operation, servicing and waste; it does not automatically require a restaurant, bar, commercial kitchen or fifty seats. Storage/plant/WC can be flagged as unresolved support needs without being silently removed or imposed at hotel scale.

For required relationships define **must connect directly**, **nearby preferred**, **separate**, **controlled access** or **no requirement**. Specify whether a relation means a door, visual contact, shared boundary or route distance. Distinguish public, ticketed, staff, delivery and out-of-hours movement. A school group is a use scenario, not a fixed assumed occupant count.

## Area accounting before form

State the measurement convention; do not call an ad hoc schematic convention a certified area standard.

- Count each enclosed floor once. If measured to outer wall faces, `gross enclosed floor = net usable programme + dedicated circulation + wall/structure/service-shaft footprints + explicitly identified other enclosed residual`.
- Shared use is allocated once in the physical area total. List multiple activities separately without adding their simultaneous area twice.
- Circulation integrated through a foyer/exhibition zone may be inside its net area; reserve an actual clear route there and identify the overlap in the ledger rather than adding it again.
- Courtyards, roof openings, external covered terraces and unbuilt land are classified separately; their area is not enclosed programme area. Upper-floor voids are not floor area. A roof outline is not necessarily a floor outline.
- At early feasibility, wall/circulation allowances are declared estimates. Replace them with measured footprints in the plan. A net-to-gross multiplier is not proof of fit.
- Calculate actual polygon/region areas, including holes. For a curved plan record approximation tolerance when tessellation is required. Report unit conversion explicitly.

Calculate lower-bound required net area against available enclosed area. If the net minimum alone exceeds gross capacity, infeasibility is certain under current limits. If it is lower, feasibility remains unproven until circulation, walls, geometry and activity fit are tested. A scalar area total cannot validate a narrow or fragmented plan.

A decisive contradiction in supplied dimensions/programme can be explained before scratch mutation or save-capability tests. Do not spend execution time trying to pack a demonstrably impossible schedule.

When the brief does not fit, report the deficit and options: change allowable footprint (only if permitted), programme/area priorities, shared or time-separated use, or an explicitly authorised extra level. Do not turn deficits into arbitrary uniform shrinkage. List minimum requirements that would change and obtain the student's decision before presenting the altered brief as fulfilled.

## Lightweight intake contract

Show the footprint mode, protected items, required programme, proposed assumptions, missing blockers and the finite run scope in one compact table. Ask only questions that change the next action. Optional unknowns can accompany provisional options; blockers such as units, perimeter permission and required use cannot be silently defaulted.

Choose a sensible session output subfolder within existing write authority if none was named, and report it. An inspected new empty model can establish that no existing model objects need protection; it does not establish permission to change a supplied site/boundary. Do not turn retrievable facts and reversible folder choices into unnecessary questions.
